A63 improvement scheme – St James Street to Market Place
- Start date: 01-May-20
- Due date: 31-May-26
- Summary of works: Major A63 Improvement scheme – full infrastructure change, operating under a Development Control Order which gives the powers to National Highways to implement this scheme. Lane and road closures until completion of scheme.
- Utility/HCC: National Highways
Drypool Bridge
- Start date: 21-Dec-25
- Due date: 22-Dec-25
- Summary of works: Temporary emergency repair to the surfacing on the carriageway of Drypool bridge. Overnight road closure (6pm to 6am).
- Utility/HCC: Hull City Council
Humber Dock Street
- Start date: 03-Feb-25
- Due date: 30-Apr-26
- Summary of works: Public realm works, road closure in place. Works are to take place on the public right of way along Humber Dock Street between junctions with Blanket Row and Humber Street.
- Utility/HCC: Hull City Council
Lambworth
- Start date: 13-Dec-25
- Due date: 23-Dec-25
- Summary of works: Emergency repair at the junction of Sutton Road. Two-way signals in place.
- Utility/HCC: Northern Power Grid
Princes Dock Street
- Start date: 03-Feb-25
- Due date: 30-Apr-26
- Summary of works: Works are part of Hull Public Realm development scheme. Road closure in place.
- Utility/HCC: Hull City Council
Saltshouse Road
- Start date: 22-Dec-25
- Due date: 22-Dec-25
- Summary of works: Provide and fix new cover outside 56 Saltshouse Road. Two-way signals in place 9am to 5pm only.
- Utility/HCC: Yorkshire Water
Wawne Road
- Start date: 04-Dec-25
- Due date: 19-Dec-25
- Summary of works: Install manifold and chambers outside 1-7 Wawne Road. Two-way signals in place 7am to 7pm only.
- Utility/HCC: Yorkshire Water