
Need to know
The latest roadworks to help you plan your journeys
Here is the latest summary of road closures and traffic signals to help you plan your journey around Hull and East Yorkshire:
- Wawne Road Roundabout (Until 6 Aug): Full road closure connecting Bude Road, Wawne Road, and Holwell Road for a Hull City Council improvement scheme.
- Wincolmlee (Until 28 Jul): Closed at the junction with Air Street while Yorkshire Water repairs an emergency water leak.
- Ennerdale (Until 29 Oct): Roundabout improvement works by Hull City Council with ongoing lane closures in place.
- Chanterlands Avenue (20 Jul – 27 Jul): Southbound lane closed to replace a damaged cable draw pit cover in the carriageway (Northern Powergrid).
- Witham (3 Aug – 4 Aug): Lane closure near Vault Bar for washout hydrant installation on the water main (Yorkshire Water).
- Abbey Street (29 Jul – 4 Aug): Two-way signals outside No. 81 for sewer excavation and repair (Yorkshire Water).
- Ark Royal (13 Jul – 31 Jul): Multi-way signals for utility works (Northern Gas Networks).
- Auckland Avenue (20 Jul – 21 Aug): Multi-way signals in place for utility works (Northern Powergrid).
- Chanterlands Avenue (3 Aug – 31 Aug): Multi-way signals at the Murrayfield Road junction for utility works (Northern Powergrid).
- Ellerburn Avenue (28 Jul – 29 Jul): Multi-way signals at the 38th Avenue junction for major sewer desilting (Yorkshire Water).
- Hessle Road (29 Jul – 9 Aug): Multi-way signals outside No. 335 and 344 for telecom works (MS3).
- Inglemire Lane (20 Jul – 21 Aug): Multi-way signals for utility works (Northern Powergrid).
- Marfleet Lane (7 Jul – 1 Aug): Two-way signals from No. 680 to The Orchard junction (Northern Powergrid).
- Marfleet Lane (23 Jul – 29 Aug): Two-way signals from No. 702 to 732 (Northern Powergrid).
- Newland Park (22 Jul – 29 Jul): Multi-way signals at the Cottingham Road junction for burst water main repairs (Yorkshire Water).
- Runnymede Avenue (28 Jul – 29 Jul): Multi-way signals outside No. 22 to repair/replace manhole covers (Yorkshire Water).
- Sutton Road (3 Aug – 14 Aug): Two-way signals opposite Iroka House for utility works (Yorkshire Water).
- Tedworth Road (23 Jul – 29 Jul): Multi-way signals outside No. 3 for burst water main repairs (Yorkshire Water).
- The Orchard (10 Jul – 1 Aug): Multi-way signals at the Marfleet Lane junction (Northern Powergrid).
- Tower Street (3 Aug – 12 Aug): Two-way signals in place for utility works (Northern Powergrid).
- Wawne Road (23 Jul – 5 Aug): Two-way signals in place for utility works (Northern Gas Networks).
At Reach and across our entities we and our partners use information collected through cookies and other identifiers from your device to improve experience on our site, analyse how it is used and to show personalised advertising. You can opt out of the sale or sharing of your data, at any time clicking the “Do Not Sell or Share my Data” button at the bottom of the webpage. Please note that your preferences are browser specific. Use of our website and any of our services represents your acceptance of the use of cookies and consent to the practices described in our Privacy Notice and Terms and Conditions.


